Feuilletine Capacity Planner

Work back from accepted daily demand to the hourly gross production requirement. Enter your own schedule and yield assumptions.

Your Inputs

Operating assumptions

Your Planning Result

Enter your inputs to calculate.

Discuss Your Project with UD

Calculation Method

Required gross kg/h = demand ÷ (hours × utilization/100 × yield/100). Yield includes rejects and fines; utilization includes idle time. These are buyer planning inputs.

  • All input fields start empty. No UD output, efficiency or price is assumed.
  • Enter non-negative finite numbers; quantities and costs are limited to 1,000,000 for this planning tool; hours to 24 and percentages to 100.
  • The result is an arithmetic estimate to use in a project discussion.