Shift Output Planner

A 24-hour output figure is not a shift plan. Apply your own uptime and yield to see what actually reaches the packer.

Your own uptime and yield

1,800 / 3,500 / 5,000 for the 32-, 60- and 80-mold builds.

Changeover, cleaning and stoppages all sit inside this number.

Share of baked waffle that reaches the packer saleable.

The published 24-hour figures are the manufacturer’s own. Uptime and yield are yours: this tool applies them and nothing else, and it does not model ramp-up after a cold start. Back to the soft waffle production line page · Send these numbers to an engineer