Sachima FAT Throughput Record | UD

Sachima FAT Throughput Record

Turn one timed factory acceptance test sample into a measured good-product rate. The 1,000 kg/h brochure figure remains a rated capacity until the recipe, measurement point, test duration and reject rule are written into the acceptance protocol.

Timed test sample

Measured result

Good product rate
Rated-capacity ratio
First-pass yield

Record the recipe, syrup solids, strip dimensions, fryer settings, measurement point, planned stops and reject definition alongside this result. A short sample is not a production guarantee.

Build the FAT acceptance basis with UD